MV-1.
Considered down to the connection.
Defined connection modules as a shared basis for material preparation and installation. With documented DN32 and DN40 variants.

MV-1 · Schematic illustration, not an installation drawing
One combination.
Clearly assigned modules.
MV-1 combines recurring connection areas of a heat pump system with structured materials and documentation.
- Connection groups rather than an unstructured selection
- Components and quantities assigned to each module
- Variant-specific cylinder and outdoor unit connections
The Midea model, cylinder variant and system configuration are confirmed before a binding kit selection.
A place for
every connection.
The designations come from the existing MV-1 documentation.
| Module | Connection area | Assignment |
|---|---|---|
| MV-1 VLHK | Heating circuit flow | Common module structure |
| MV-1 RLHK | Heating circuit return | Common module structure |
| MV-1 TW | Cold-water inlet | Common module structure |
| S-KSE32 / S-KSE40 | Combination cylinder connection | DN32 / DN40 |
| M-V1WP32 / M-V1WP40 | Outdoor unit connection | DN32 / DN40 |
| MV-1 | Base materials: pipework, fixings, insulation | Confirm variant and quantities |
DN32 or DN40.
Matched to the design.
The dimension follows the technical design. It is considered together with the pipe system, connection sizes and equipment combination.
Connection modules for DN32
Flow, return and cold-water inlet modules complement the variant-specific modules. Pipe dimensions, fittings and quantities are specified in the kit bill of materials.
Understand how it fits together.

Schematic illustration from the existing MV-1 document. Does not establish a complete scope of supply.
See how it
comes together.
The existing documents combine a schematic 3D view with module parts lists. The agreed documentation version applies to the specific project.
What is included?
The bill of materials for the quoted variant is the binding basis.
| Connection kit | Assigned connection modules and supplementary materials according to the bill of materials. |
|---|---|
| Heat pump & cylinder | Shown to illustrate the connections. This page does not offer them as part of the connection kit. |
| On-site work | Pipe routes, electrical work, positioning and other project services are defined separately. |
| Terms & delivery | Project-specific agreement on scope, price and delivery date. |
The next step?
The right connection.
Let’s talk about your business, your equipment combination or a distribution partnership.
